CURRENT HIGHWAY PROJECTS IN VICTORIA COUNTY

TxDOT Project Tracker

To see all highway projects in Victoria County, follow these steps:

1. Click on "Enter Project Tracker" at the bottom of the page

2. Select "County" in the drop-down menu "View Highway Projects By"

3. Select "Victoria" in the county drop-down menu


BEN WILSON STREET CORRIDOR STUDY

A corridor study was completed along Ben Wilson Street between Business US 59 and Sam Houston Drive. The study identifies design treatments to improve the overall safety of the corridor, particularly addressing pedestrians and bicyclists. It incorporates the anticipated new development along Ben Wilson Street from the University of Houston-Victoria. Both the final report and presentation given to the MPO Policy Advisory Committee can be found below. This study was completed in 2016.

Final Report
Presentation to MPO Policy Advisory Committee


SIGNAL TIMING COORDINATION STUDY

Traffic signal timing analyses were performed along Navarro Street, Main Street, and Houston Highway / Rio Grande Street.  The project includes data collection, the development of existing conditions models, and the delivery of timing plan optimizations and improvement plans.  The coordination of these signals is anticipated to result in improved traffic flow characteristics, including fewer vehicle stops and delays.  This project is shared between the MPO and the City of Victoria Public Works Department. This study was completed in 2015.


STATE HIGHWAY 185 & FM 1432 INTERSECTION STUDY

An intersection study was completed for SH 185 and FM 1432. The MPO and TxDOT identified this intersection as a high priority for future improvements due to its proximity to the Port of Victoria. Truck traffic to and from the port has dramatically increased over the last two years (2010-2012) and is only expected to increase; consequently, significant congestion and traffic safety issues will continue to persist.

This project identified alternative intersection layouts and developed cost estimates for potential highway improvements. The end product will provide viable intersection alternatives the MPO's Policy Advisory Committee and TxDOT can consider. This information is necessary for TxDOT to move forward with securing funding for the needed improvement. This study was completed in 2012. This project is currently on the unfunded project list in the Metropolitan Transportation Plan.


US 87 & FM 447 CORRIDOR ALIGNMENT STUDY

An alignment and lane configuration study was completed for the US 87 and FM 447 intersection to analyze alternatives that will reduce the occurrence of crashes. Various alternatives were considered, including flashing lights on either side of the roadway, a stop sign with flashing lights, grade separation, and relocating the intersection by 370 feet. Following the complete analysis, grade separation was determined as the preferred option; it is anticipated to improve safety by 80 percent. The study was completed in 2012. This project began construction in 2016, and is expected to be completed in 2018.